Every Piece of Waste Is a Misplaced Resource.
Waste Gurus Inc. is a waste and energy infrastructure consultancy based in Edmonton, Alberta. We advise public authorities, Indigenous communities, and private industry on choosing treatment technology for their waste streams. Through our ventures, we also develop that infrastructure ourselves.
The two roles are never blurred. When we advise, we sit on your side of the table with no stake in which technology wins. If an engagement grows into a development partnership, that happens openly and on your terms. Either way, the technology assessment is validated independently.

Leadership

Samir Hamid
Chief Executive Officer
Samir has more than 15 years in the waste sector. He is an original founder of Varme Energy (opens in a new tab) and an active advisor to the Waste-to-Energy Research and Technology Council (opens in a new tab).
Over the last four years he has assessed more than 25 operating waste-to-energy facilities across North America, Europe, and China, spanning mass burn combustion, gasification, pyrolysis, biofuels, and carbon capture. He founded Waste Gurus to fit the technology to the waste stream, rather than the reverse.
25+ Facilities, Seen in Operation. Not in Brochures.
Our judgment comes from site work: what each technology does under real operating conditions, in real places.
Pins mark places we have worked. Halos mark the wider regions of our 25+ facility assessments.
Four Years of Assessments on Three Continents
North America, Europe, China
Every major treatment technology, assessed on site at operating facilities.
Home Base and National Reach
Alberta and Canada
Based in Edmonton and working with municipalities and industry in every Canadian province and territory.
Canada-wide and Asia-Pacific
Current Interests
Municipal waste audits and early engineering (pre-FEED) studies across Canada, and project origination in the Asia-Pacific, beginning with the Philippines.
Working With Indigenous Communities
Waste infrastructure decisions land hardest on the communities that carry the waste. Nowhere is the gap between estimates and measured reality wider than in remote and Indigenous communities.
We work with First Nations and Métis communities as partners, not just clients. That means community-led priorities, measured evidence the community owns, and technology recommendations made to the community rather than around it.
Where a community wants equity participation in a project, today’s funding landscape makes that real. Options include loan guarantees through the Alberta Indigenous Opportunities Corporation, which has backstopped more than $600 million of Indigenous ownership in energy and infrastructure projects, and the federal Indigenous loan guarantee program. We structure projects so that participation is built in from the first conversation, not retrofitted at the end.
We Build What We Advise On.
Our advice is shaped by what we build ourselves: ventures that apply the right technology to three very different waste streams.

Varme Energy (opens in a new tab)
Varme is developing a waste-to-energy facility with integrated carbon capture and storage in Alberta’s Industrial Heartland. It is designed to divert municipal and commercial residual waste from landfill, and to capture the CO₂ produced in combustion for permanent geological storage.
- MAGNETIKSOLUTIONS
Magnetik Solutions (opens in a new tab)
Magnetik applies near-zero-emission treatment to biomedical and healthcare waste, an area where conventional incineration faces both regulatory and public-acceptance difficulties.
- Coming Soon
Coming Soon
Pyrolysis capacity for end-of-life tires, a stream that is difficult to landfill, costly to store, and well suited to thermal conversion. Venture details to be announced.
Independent Technology Validation
Technology shortlists are validated by WtERT (opens in a new tab), the Waste-to-Energy Research and Technology Council. WtERT originated at the Earth Engineering Center at Columbia University and links academic and industry research on thermal and biological waste treatment across more than 20 countries.
WtERT is retained on a fixed professional fee. The fee does not depend on which technology is selected, on a project proceeding, or on any facility reaching financial close. If a client authority prefers, it can engage WtERT directly or jointly, with the validation report addressed to it as client.
Representing Canada Abroad
Waste Gurus has represented Alberta and Canada on trade delegations and industry roadshows organized by the Government of Alberta and the Government of Canada. We hold an existing file with Export Development Canada, Canada’s export credit agency.
For international engagements, a Canadian sponsor can pursue federal co-financing channels that are not available to purely local or regional developers, including facilities administered through the Asian Development Bank.